Chatty Valley Collector Sewer (Nodes 20 – 24)
Flow measuring equipment inside manhole |
Grit collector – reinforcing on blinding layer |
Grit collector – formwork and reinforcing |
Grit collector – formwork removal |
Penstocks – installation in diversion chamber |
Link sewer – paramedics on standby during construction |
Link sewer – lowering of labourer into potentially dangerous gas filled chamber |
Link sewer – ventilation during concrete cutting operation |
Link sewer – construction of chamber on top of existing pipeline |
1000mm Ø GRP U-trap – lower end |
1000mm Ø GRP U-trap – upper end |
1000mm Ø GRP U-trap – tie-in to pipeline |
|