Coega Zone 5 Metals Cluster

 01 - CDC Zone 5 - Step Excavation for Collector Sewer

Step Excavation for Collector Sewer

02 - CDC Zone 5 - Casting of Concrete Roof Slab for Electrical Substation

Casting of Concrete Roof Slab for
Electrical Substation

 03 - CDC Zone 5 - Sewer Trench Excavation

Sewer Trench Excavation

 04 - CDC Zone 5 - Priming of Newly Constructed Road

Priming of Newly Constructed Road

 05 - CDC Zone 5 - 2.1x2.1 Stormwater Box-Culvert

2.1 x 2.1 Stormwater Box Culvert

 06 - CDC Zone 5 - Placing of Box-Culverts

Placing of Box Culverts

 07 - CDC Zone 5 - Road Construction Layer Works

Road Construction Layer Works

 08 - CDC Zone 5 - Setting Out of Attenuation Pond

Setting Out of Attenuation Pond

 09 - CDC Zone 5 - Excavation of Attenuation Pond

Excavation of Attenuation Pond

 10 - CDC Zone 5 - Excavation of Attenuation Pond

Excavation of Attenuation Pond

 11 - CDC Zone 5 - Attenuation Pond Earth Works

Attenuation Pond Earth Works

 12 - CDC Zone 5 - Attenuation Pond Levelling & Low-Flow Channel Construction

Attenuation Pond Levelling & Low Flow
Channel Construction

 13 - CDC Zone 5 - Attenuation Pond Outlet Pipe Laying

Attenuation Pond Outlet Pipe Laying

 14 - CDC Zone 5 - Attenuation Pond Outlet Pipe Construction

Attenuation Pond Outlet Pipe Construction

 15 - CDC Zone 5 - Attenuation Pond Low-Flow Channel Constructin at Outlet

Attenuation Pond Low Flow Channel
Construction at Outlet

 16 - CDC Zone 5 - Attenuation Pond Outlet

Attenuation Pond Outlet

 17 - CDC Zone 5 - Attenuation Pond Low-Flow Channel at Inlet

Attenuation Pond Low Flow Channel
at Inlet

18 - CDC Zone 5 - Attenuation Pond with Low-Flow Channel

Attenuation Pond with Low Flow Channel

 19 - CDC Zone 5 - View of Attenuation Pond from Inlet

View of Attenuation Pond from Inlet

 

Switch to our desktop site